Waterside Hotel, Donabate
Project:
|
Installation of Super BAF Wastewater Treatment System
|
In 2016 O’Reilly Oakstown Ltd were commissioned to design, build and install a 284 PE Super BAF Wastewater Treatment System.
Total Volume – 180m3 Super BAF Wastewater Treatment System
- Hydraulic Load – 46m3/day
- BOD5 Load – 20kg/day
O’Reilly Oakstown Environmental manufacture a range of precast concrete tanks suitable for Wastewater, Stormwater, Attenuation and Oil/Water Separation.