Newcastle House
Project:
|
Super BAF Wastewater Treatment System
|
In November 2017, O’Reilly Oakstown Ltd were commissioned to design, build and install a Super BAF Wastewater Treatment System.
This was based on EPA requirements of20BOD/30SS/20NH4N (as N).
- Max.Hydraulic Loading: 73.4m3/d.
- Max.BOD Loading: 22.9kg/d.
- Max.Ammonia Loading: 3.15kg/day.